IMPROVEMENT STUDIES

I-55 AT IL 59 ACCESS PROJECT
  • Home
  • Improvement Studies
    • Improvement 01 - US 52 from River Rd to Houbolt Rd
    • Improvement 02 - I-55 from I-80 to US-52
    • Improvement 03 - Olympic Blvd from I-55 East Frontage Rd to Houbolt Rd
    • Improvement 04 - Seil Rd from Raven Rd to IL 59
  • Get Involved
    • CAG Meetings
    • Public Information Meetings
  • Resources
  • Contact

Improvement Studies

  • Improvement 01 - US 52 from River Rd to Houbolt Rd​
  • Improvement 02 - I-55 from I-80 to US-52
  • Improvement 03 - Olympic Blvd from I-55 East Frontage Rd to Houbolt Rd
  • Improvement 04 - Seil Rd from Raven Rd to IL-59
The recommended preferred alternative was discussed at Community Advisory Group Meeting #4, which was held on July 16, 2018. The preferred alternative received concurrence from the Federal Highway Administration on September 13, 2018, and includes the above four independent improvement studies.
Picture
Read the Preferred Alternative Report Here
Picture
View the US 52/River Rd/Houbolt Rd Page

01 US 52 from River Rd to Houbolt Rd

The proposed US 52 Capacity Improvement Project is intended to improve safety and operations. This alternative includes the reconstruction and widening of US 52 from east of River Rd to Houbolt Rd to provide two travel lanes in each direction with a raised curbed center median, and major intersection improvements at the US 52 intersection with IL 59, the I-55 interchange ramps and at Houbolt Rd. The project will accommodate connectivity of sidewalks and existing trails.

02 I-55 from I-80 to
US 52

The Interchange Project includes the conversion of the existing partial interchange at IL 59 and I-55 to a full access diverging diamond interchange, also known as a DDI. A DDI is a double cross over diamond. The diamond shaped configuration allows for two directions of traffic on a bridge to cross to the opposite side of the bridge. The benefits of this type of interchange include improved safety and operations. This project provides connections for pedestrians and bicyclists over I-55 to IL 59 and new auxiliary lanes on I-55 between IL 59 and US 52 to improve congestion and safety for vehicles entering and exiting the expressway. This improvement study is complete and is under construction.
Picture
View the I-55/I-80/US 52 Page

Picture
View the I-55 East Frontage Rd Page

03 Olympic Blvd from I-55 East Frontage Rd to Houbolt Rd

The East-West Connector Route Project includes the extension of Olympic Blvd west to the I-55 East Frontage Rd. This alternative includes intersection improvements at Houbolt Rd and Olympic Blvd as well as the construction of a new bridge crossing the Rock Run Creek floodplain and wetlands. This project provides a new shared use pedestrian/bike path and improves connectivity to the Rock Run Trail. This improvement study is complete. Subsequent phases of development are being led by the City of Joliet.

04 Seil Rd from Raven Rd to IL-59

The proposed Seil Rd Capacity Improvement Project is intended to add capacity, mitigate traffic congestion and improve safety. The Seil Rd project between Raven Rd and I-55 West Frontage Rd includes the construction of mini-roundabouts at the Seil Rd intersections with States Lane and with Raven Rd. In addition to the mini-roundabouts, the proposed alternative includes a center left turn lane, bridge reconstruction and improved pedestrian/bicyclist connectivity over the DuPage River. This improvement study is complete. Subsequent phases of development are being led by the Village of Shorewood.
Picture
View the Seil Rd from Raven Rd to IL-59 Page

Improvement Studies Pages

  • Improvement 01 - US 52 from River Rd to Houbolt Rd​​
  • Improvement 02 - I-55 from I-80 to US-52​
  • Improvement 03 - Olympic Blvd from I-55 East Frontage Rd to Houbolt Rd​
  • ​Improvement 04 - Seil Rd from Raven Rd to IL-59
Picture
Picture
Picture
Picture
Picture

Picture
Email: [email protected]
Picture
Picture
City of Joliet
www.Joliet.gov
Illinois Department of Transportation
​
201 W. Center Court
Schaumburg, IL 60196
Copyright © 2025 - Illinois Department of Transportation
  • Home
  • Improvement Studies
    • Improvement 01 - US 52 from River Rd to Houbolt Rd
    • Improvement 02 - I-55 from I-80 to US-52
    • Improvement 03 - Olympic Blvd from I-55 East Frontage Rd to Houbolt Rd
    • Improvement 04 - Seil Rd from Raven Rd to IL 59
  • Get Involved
    • CAG Meetings
    • Public Information Meetings
  • Resources
  • Contact